Depth varies by site and geology, so no single number accurately describes every Famidi project.
What this means in practice
A project-specific drilling or contractor record is the appropriate source.
Greater depth does not automatically mean better water or a more successful project.
Public pages should publish a depth only when it can be tied to the named project and retained evidence.
How Famidi documents water infrastructure
A Famidi water project moves through location review, local contracting, construction, completion checks, and a public handoff record. Evidence may include agreements, expenses, construction stages, finished taps or pumps, water flow, and a project identifier.
A photograph cannot establish water quality, yield, maintenance performance, or long-term reliability by itself. Those questions require the appropriate technical test, record, or follow-up.
Check the underlying information.
Editorial standard: This page is reviewed by a person, sourced to Famidi records or authoritative references, and revised when the program or underlying guidance changes. It does not replace legal, tax, medical, or financial advice.