How does Famidi build and document water wells?

Reviewed by Famidi editorial team
Direct answer

Famidi’s water projects move through a site review, local contracting, construction, completion checks, and a documented handoff. The public record may include agreements, expense sheets, drilling or construction media, the finished pump or tap system, water flowing, location details, and a plaque or project identifier.

A finished project is more than a drilled hole

The usable result may be a hand pump or a system with storage and public taps, depending on the site. Completion means the infrastructure can be reached and used—not simply that drilling activity occurred.

How the evidence is assembled

Different records support different stages. Agreements and expenses describe procurement; dated field media shows construction; finished infrastructure and flowing water support completion; location and project identifiers connect the pieces. Famidi’s archive keeps those records together when available.

Why exact claims matter

A scouting visit is not a completed project. A plaque alone is not the infrastructure. A photo of flowing water does not by itself explain long-term maintenance. Famidi publishes what its retained evidence supports and names the boundary when a stronger claim cannot be made.

Sources and records

Check the underlying information.

  1. Famidi Water Wells program
  2. Famidi project ledger
  3. Field story: what a finished water project looks like
  4. UNICEF Afghanistan 2025 humanitarian report: WASH context ↗

Editorial standard: This page is reviewed by a person, sourced to Famidi records or authoritative references, and revised when the program or underlying guidance changes. It does not replace legal, tax, medical, or financial advice.